Infrastructure and Utilities

Wadi Mujib Bridge

All projects
Infrastructure and UtilitiesNo photograph on record
About the work

140m long , 13.5 wide prestressed concrete stay bridge carried by 2-concrete towers central span , 80ms and 30m end spans . The bridge is founded on 40-concrete pored piles 1.20m dia x 25m deep.

140m long , 13.5 wide prestressed concrete stay bridge carried by 2-concrete towers central span , 80ms and 30m end spans . The bridge is founded on 40-concrete pored piles 1.20m dia x 25m deep.