Project involved the reclamation of more than one million square meters of land and the creation of two harbor basins for vessels of 80,000 DWT, quay walls, public buildings and industrial facilities with complete infrastructure including roads; paved areas; power distribution; lighting…
Project involved the reclamation of more than one million square meters of land and the creation of two harbor basins for vessels of 80,000 DWT, quay walls, public buildings and industrial facilities with complete infrastructure including roads; paved areas; power distribution; lighting; telecommunications; fuel systems; utilities and services; and landscaping.
The main elements of the project include: - Multipurpose Terminal: 830,000 m2 in area. - Heavy Loads Area: 100,000 m2 in area - Passenger Terminal: 80,000 m2 in area with 310m of 14m berths. - Car Terminal: 175,000 m2 in area having 50m of ro-ro ramps (berths) with storage and parking areas. - Service Harbor: 109,000 m2 in area.